Skip to content
Nagarik SignalPublic civic proof
ExploreInsightsHow it worksReport issue
Report
Nagarik Signal

Public proof for public problems.

Solana devnet proof online

Public records, independent checks, and accountable follow-up.

Use NagarikExplore the mapReport an issuePublic insights
TrustHow it worksPrivacy and safety
Public insights

Civic issues that need follow-up

Public records only. Samples and engineering fixtures are excluded.

01

Tracked civic records

4
02

Need follow-up

4
03

Reached signal threshold

0
04

Marked resolved

0
05

Average days observed

31
Official follow-up

Official follow-up activity

Steward-recorded events, separate from Solana integrity checks.

Routed
43 prepared only
Sent
1reference recorded
Receipt
0artifact attached
Overdue
1follow-ups past due
Recent events6 total
Issue #13Kathmandu Metropolitan City / KMC Gunaso emailfollow upJul 17, 2026, 7:09 PMIssue #13Kathmandu Metropolitan City / KMC Gunaso emailsubmittedJul 17, 2026, 7:08 PMIssue #15Office of the Prime Minister and Council of Ministers / Hello SarkarpreparedJul 16, 2026, 8:28 PMIssue #14Kathmandu Metropolitan City / KMC GunasopreparedJul 16, 2026, 8:28 PMIssue #13Kathmandu Metropolitan City / KMC GunasopreparedJul 16, 2026, 8:27 PMIssue #12Office of the Prime Minister and Council of Ministers / Hello SarkarpreparedJul 16, 2026, 8:27 PM
Category pressure

Open records by public asset

01Water / drainage2 open / 2
02Waste1 open / 1
03Road1 open / 1
Public attention

Latest public signals

No public signals yet.Public signals will appear here.
Needs attention

Longest-observed open records

01Utility poles still obstruct sections of the Nagdhunga-Mugling widening projectOpen / Nagdhunga-Mugling corridor37days02Dhangadhi and nearby Kailari settlements face recurring groundwater shortagesOpen / Dhangadhi and Kailari34days03Central Kathmandu drainage capacity remains a monsoon follow-up issueOpen / Jamal and central Kathmandu26days04Bancharedanda landfill service life is under documented pressureOpen / Kathmandu Valley waste system25days
Resolution trail

Resolved proof

No public record is marked resolved yet.The first after-state artifact and status proof will appear here.
Open the record

Inspect the issues behind the index

View all public records
Source dossier for Utility poles still obstruct sections of the Nagdhunga-Mugling widening projectPublic-source dossier
37days since source report
RoadOpen

Utility poles still obstruct sections of the Nagdhunga-Mugling widening project

A June 2026 Kathmandu Post report, citing project and electricity-authority officials, said 75 poles remained on the eastern section and 107 on the western section of the 94.66 km corridor. This dossier records the published claim for public follow-up; it does not assert that the counts are unchanged today.

Nagdhunga-Mugling corridor0 public signals
Source review due
#12
Source dossier for Dhangadhi and nearby Kailari settlements face recurring groundwater shortagesPublic-source dossier
34days since source report
Water / drainageOpen

Dhangadhi and nearby Kailari settlements face recurring groundwater shortages

A June 2026 Kathmandu Post report said Dhangadhi was distributing water by tanker in affected wards and cited municipal and WASH officials describing dry hand pumps, deeper borewells and weak groundwater recharge in nearby Kailari. The current field status still requires rechecking.

Dhangadhi and Kailari0 public signals
Source review due
#15
Source dossier for Central Kathmandu drainage capacity remains a monsoon follow-up issuePublic-source dossier
26days since source report
Water / drainageOpen

Central Kathmandu drainage capacity remains a monsoon follow-up issue

Kathmandu Metropolitan City's public report said roads around Ganatantra Park, Jai Nepal Hall and Jamal were inundated during 2026 rains, and identified limited drainage capacity plus debris carried by runoff as contributing factors. This is an official-source dossier, not a firsthand field report.

Jamal and central Kathmandu0 public signals
Source review due
#13
Source dossier for Bancharedanda landfill service life is under documented pressurePublic-source dossier
25days since source report
WasteOpen

Bancharedanda landfill service life is under documented pressure

Kathmandu Metropolitan City reported that waste volumes are shortening the planned service life of Bancharedanda and described source segregation, material-recovery centres and inter-municipal financing as needed responses. The record tracks the official statement and its follow-up window.

Kathmandu Valley waste system0 public signals
Source checked by Kathmandu Metropolitan City - Metro News
#14
Area follow-up index

Where unresolved time is accumulating

Average age of open public records by locality
01Nagdhunga-Mugling corridor37avg days1open / 1 total02Dhangadhi and Kailari34avg days1open / 1 total03Jamal and central Kathmandu26avg days1open / 1 total04Kathmandu Valley waste system25avg days1open / 1 total